Angle steel frame
500kV Kyrgyzstan Datka-Keming Transmission Line
Project Overview

The 500kV Kyrgyzstan Datka-Keming Transmission Line is a landmark energy cooperation project between China and Kyrgyzstan, constructed by TBEA Co., Ltd. as part of efforts to improve Kyrgyzstan’s Southern Grid. With a total contract value of $0.39 billion USD and a 36-month construction period, this project is the largest energy infrastructure collaboration between the two nations and a crucial milestone for the Kyrgyzstan State Grid.

The project aims to:
• Enhance power transmission capacity between southern and northern Kyrgyzstan.
• Strengthen grid stability by reducing dependence on neighboring countries for power transmission.
• Support regional economic development by ensuring a reliable electricity supply for industries and households.

The Datka-Keming line integrates Kyrgyzstan’s previously fragmented grid into a unified national network, improving energy security, transmission efficiency, and long-term economic stability.
Construction Plan & Execution

1. Route Planning & Site Selection

The transmission line spans mountainous terrains, valleys, and river crossings, requiring:
• Detailed topographical surveys to optimize the route.
• Seismic risk assessments to ensure infrastructure resilience.
• Environmental impact studies to minimize ecological disruption.

Given Kyrgyzstan’s rugged geography, the project incorporated specialized engineering solutions to tackle the high-altitude and extreme weather conditions.
2. Tower Erection & Foundation Engineering

To ensure structural stability and longevity, the transmission towers were designed using:
• High-strength steel to withstand heavy winds and snow loads.
• Deep-pile and rock-anchor foundations for stability on mountainous terrain.
• Pre-fabricated tower components for faster and safer assembly.

Helicopter-assisted tower installation was employed in remote and inaccessible locations, reducing environmental impact and ensuring efficient construction progress.
3. Conductor Stringing & Insulation

The transmission line utilizes advanced conductors and insulation technology, including:
• High-performance aluminum alloy conductors for reduced energy loss.
• Anti-icing and anti-corrosion coatings to withstand extreme cold conditions.
• Composite polymer insulators for improved durability and electrical insulation.

Specialized tension stringing methods ensured precise conductor alignment and minimal transmission losses, optimizing overall grid efficiency.
4. Grid Integration & Substation Construction

The project included the integration of the Datka and Keming substations, enabling:
• Stable voltage regulation across the national grid.
• Seamless energy transfer between the north and south without reliance on external grids.
• Smart relay protection and automation for real-time system monitoring.

With the introduction of SCADA (Supervisory Control and Data Acquisition) systems, operators can monitor power flow, detect faults, and optimize grid performance remotely.
Design & Technical Services

1. Power System Engineering & Optimization

Our engineering services covered:
• Load flow analysis and stability studies to ensure optimal energy distribution.
• Short-circuit fault simulations for enhanced grid protection.
• Reactive power compensation planning to stabilize voltage fluctuations.

2. Smart Grid & Automation

To modernize Kyrgyzstan’s power infrastructure, the project incorporated:
• Automated grid control systems for real-time power management.
• IoT-enabled sensors for predictive maintenance and fault detection.
• Energy loss reduction techniques, improving overall transmission efficiency.

3. Environmental & Safety Considerations

To comply with international safety and environmental standards, we implemented:
• Low-impact construction techniques to protect fragile ecosystems.
• Seismic-resistant designs to prevent damage from earthquakes.
• Wildlife protection measures, including avian flight diverters to safeguard bird populations.
After-Sales Service & Maintenance

1. Routine Maintenance & Performance Monitoring

To ensure long-term operational efficiency, we offer:
• Regular tower inspections using drones and thermal imaging.
• Transformer and substation equipment testing for voltage stability.
• Conductor maintenance programs to address wear and weather-related damages.

2. Emergency Response & Grid Reliability

A 24/7 emergency response team is available to handle:
• Grid disruptions due to severe weather or technical failures.
• Rapid transformer and circuit breaker replacement.
• Remote troubleshooting support via SCADA system alerts.

3. Future Expansion & Upgrades

To accommodate growing electricity demand, we provide:
• Capacity expansion solutions, including additional transmission lines and substations.
• Smart grid integration, allowing AI-driven power flow management.
• Hybrid AC/DC solutions to improve long-distance power transfer efficiency.

4. Training & Technical Support

We offer:
• On-site and remote training for Kyrgyzstan’s power grid operators.
• Workshops on advanced substation operation and maintenance.
• Continuous technical consultation for future grid development projects.

The 500kV Kyrgyzstan Datka-Keming Transmission Line is a transformational energy project, securing Kyrgyzstan’s energy independence and fostering economic growth. By connecting the northern and southern grids, this project enhances national energy security, reduces transmission losses, and strengthens bilateral cooperation between China and Kyrgyzstan.

With cutting-edge engineering solutions, advanced smart grid technology, and comprehensive after-sales services, we ensure long-term reliability and sustainability of this critical infrastructure.